Various Projects

I have a number of different projects going in preparation for my cruise next spring.

  • Storage under cockpit seats. Needs work on hatches, and to install drains.

  • Raised cockpit floor above waterline so below waterline thru hulls could be removed and hull closed.

  • Two 1.5 inch pipes installed to drain cockpit through the stern.

  • Repair soft spots on port side and fore decks.

  • Removed all hardware from deck to prepare for painting the boat.

  • Re-bed all deck hardware.

  • Build coaming boxes in cockpit.

  • I am sure I am forgetting something or two.

Soggy mush. A lot of the balsa had to be scraped away from the bottom, but had totally separated from the top layer of deck.

I would never attempt this repair from below deck.

The new floor is above the waterline so it drains through the stern.

Port side drain.

The cockpit storage is great. On the port side, I made a cradle to secure the fuel tank, and it also holds 20 more gallons in 4 gas cans.