Various Projects |
|
|
|
I have a number of
different projects going in preparation for my cruise next spring. |
-
Storage under cockpit seats.
Needs work on hatches, and to install drains.
-
Raised cockpit floor above
waterline so below waterline thru hulls could be removed and hull
closed.
-
Two 1.5 inch pipes installed
to drain cockpit through the stern.
-
Repair soft spots on port
side and fore decks.
-
Removed all hardware
from deck to prepare for painting the boat.
-
Re-bed all deck hardware.
-
Build coaming boxes in cockpit.
-
I am sure I am forgetting something or two.
|
|
|
|
 |
|
 |
Soggy mush. A lot of the
balsa had to be scraped away from the bottom, but had totally separated
from the top layer of deck. |
|
 |
|
|
I would never attempt this
repair from below deck. |
|
 |
|
 |
The new floor is above the
waterline so it drains through the stern. |
|
Port side drain. |
|
 |
|
The cockpit storage is great.
On the port side, I made a cradle to secure the fuel tank, and it also
holds 20 more gallons in 4 gas cans. |
|
|
|
|
|
|